The 3rd generator unit at the Hongyanhe Nuclear Power
Station within Liaoning province will start industrial operation soon following
the 168-hour model operation.
Yu Jianfeng, deputy general office manager of the State
Power Investment decision Cooperation, says the operation from the unit is of
excellent significance for the country's thoroughly clean energy.
"The operation in the unit proves that the technologies
of the million-kilowatt nuclear energy unit along with its capability and
construction are slowly mature. The operation catalog is pretty good as well.
inch
The third generator unit, utilizing self-designed
pressurized water aeroplano technology, can satisfy 1 / 4 of the annual
electricity consumption within the port city of Dalian.
Another two generators at the Hongyanhe Nuclear Power
Station had been put into operation in 2013.
Three more power power generator units are currently
under building at the plant.
Guo Xingang is the deputy director on the second
operation division of Hongyanhe Nuclear Power Co., Limited.
"Upon completion, the 6 units will generate forty five
billion kilowatt-hours of electrical power annually, which is about one 5 times
the total electricity usage of Dalian in 2014. inches
China now has 26 strength generator units currently
functioning that greatly cut the actual emission of sulfur dioxide and carbon
dioxide.
没有评论:
发表评论